Multilevel Deck Installation Kings provides multilevel deck installation, tiered deck building, and two-story deck construction services in the Gastonia, NC area for both residential and commercial properties. Contact us now for a free estimate.
Multilevel deck installation in Gastonia, NC costs anywhere from $9,100 to $22,750 on average for a two-level deck of about 300 to 400 square feet. The price depends on the number of levels, the height of the upper level, the decking material, the stairs and railings, the slope and number of footings, and permit or engineering needs.
Yes, we build multilevel decks for houses, townhomes, rental properties, restaurants, and other commercial sites. Let us know the property type and roughly how many levels you want.
Yes, we cover the Gastonia, NC area. Send us the property address and we'll confirm.
Gaston County Permitting has issued construction permits since August 2022, after the City of Gastonia grants a zoning permit. A multilevel deck typically goes through the city for zoning first, then the county for the building permit and inspections. In the York-Chester or Brookwood historic districts, a new deck may also need the long-form Certificate of Appropriateness used for new construction.
Typically $30 to $75 per square foot installed. We price pressure-treated levels near the ground at the low end, and composite, a tall upper level, and premium railings push it toward the high end.
Yes, usually. Extra footings, steps, railings, and framing where the levels meet all add cost.
Wood stairs to a second-story deck typically add $1,000 to $2,000. A tall composite stairway with railing and a landing can cost several times that, so tell us the height from the ground to the deck.
Yes, we confirm the price for each level, the stairs, and the railings before starting. If we hit rock or buried debris while digging footings, we talk to you before doing extra work.
Yes, if the existing deck's framing and footings are sound. Adding a level can mean new posts, new footings, and sometimes an engineer's review, so send us photos of the deck from above and underneath.
Yes, we remove the old deck and build the new one. Removal is usually priced separately and typically runs $500 to $1,000, depending on the deck's size and disposal.
We usually start once the design is approved and the permit is issued. Permit review can take several weeks in some towns, and spring and early summer are our busiest months, so late fall often books sooner.
We need the address, the rough size of each level, the height of the door the upper level serves, and photos of the yard showing the slope. Tell us what material and railing you have in mind.
No, as long as we can reach the backyard and you've approved the layout. It helps to be there when we stake out the levels and footings on the first day.
Yes, in most towns. The building department usually wants a scale drawing showing the framing, footing sizes and locations, and how the levels connect to each other and the house. We prepare the drawings, and your local office decides what's required.
Usually two or three, commonly a footing inspection before concrete, a framing inspection before the decking goes on, and a final. Your building department sets the schedule.
Yes, in some cases. A tall upper level, a hot tub, or long spans often call for stamped engineering drawings, which can add a few thousand dollars. We'll tell you if your design needs one, and your building department has the final say.
Yes, if your HOA reviews exterior changes. Send us your guidelines and we'll provide the drawings and material samples the committee asks for.
Most take a few days to a few weeks on site, depending on the size, number of levels, stairs, and railing. Inspection timing can add days between stages, and we'll give you a schedule once the design is set.
Yes, a sloped yard is one of the best reasons to build in levels. We step each level down with the grade, which keeps posts shorter than one tall platform would need.
Yes, we build a raised upper level at the door with stairs down to a lower level near the yard. The upper level needs extra bracing and taller posts, so tell us the height from the ground to the door threshold.
Yes, we can put one level at the main floor door and another at the walkout, joined by stairs. Let us know whether you want the space under the upper level kept open or dry.
Yes, and each added level brings more footings, steps, and railing.
Yes, a wraparound deck can change levels as it turns the corner to follow the grade or reach a second door. Send us photos of both sides of the house.
Yes, though angled corners take more cutting and add labor.
Yes, but a filled hot tub is usually too heavy for standard deck framing. We often set the tub on a ground-level concrete pad and build the lower deck around it, and a tub on a raised level generally needs engineering.
Yes, we can step levels down to an above-ground or in-ground pool. Pool decks often have to meet barrier and gate rules, so tell us the pool type and height.
Yes, we often build a lower level for a gas or propane fire table. Check your homeowner's insurance and the decking maker's warranty first, since some limit open flames on a deck.
Yes, we can frame a separate cooking level with blocking for heavy appliances. Tell us what the kitchen will hold and whether gas, water, or power lines need to run through the deck.
Neither is better everywhere. Freestanding levels each stand on their own posts and footings, while connected levels share framing. The site, heights, and your building department's rules decide which we use.
A single step usually runs between 4 and 7-3/4 inches. For a bigger drop we split the height into equal steps, kept within a 1/4 inch of each other so nobody trips.
Yes, a wide box step between levels doubles as casual seating, and we can add built-in benches or planters along the edges. Built-ins add to the price, so we list them separately.
No, only levels high enough to need them. Codes commonly require guards where the deck surface is more than 30 inches above the ground, and we follow your local code on the exact rule.
Yes, step and riser lights help people see each change in height at night. We run the wiring before the deck boards go down, which is far easier than adding it later.
We usually suggest composite because it needs little upkeep across a large area. Pressure-treated wood costs least but needs regular sealing, cedar costs about twice as much, and PVC won't rot.
Yes, some people put composite on the upper level and pressure-treated or a contrasting color below. Matching materials usually look cleaner, so we'll show you both options.
Yes, the area under a raised level can be storage or a covered patio. An under-deck drainage system keeps it dry, so tell us how you want to use the space.
No, we request the 811 locate before digging footings. It marks public utility lines but not sprinklers, landscape lighting, or septic lines, so point those out to us.
Yes, move furniture, grills, pots, and anything else from the deck area and the path to the backyard. Let us know about plants you want saved, and we'll work around them where we can.
Yes, in many areas, as long as the ground isn't frozen where we pour footings. Cold slows the concrete cure, so we may need to push the start back a little.
Yes, if you want separate areas for cooking, dining, and lounging. On a flat yard the step-down is mostly about layout, so we'll also price a single level if you just want space.
Yes, a new deck typically recovers around half to two thirds of its cost at resale. The return depends on your market and how well the deck fits the house.
Yes, we haul away scraps, cutoffs, and extra soil from the footings when the build is done.